Ó£ÌÒÖ±²¥

Skip to main content Go to contact form
Thermal Vacuum Chamber Test Facility Construction Ó£ÌÒÖ±²¥ Service

Ball Aerospace Technologies – Thermal Vacuum Chamber Test Facility Construction & Installation

Location: Boulder, CO

Ó£ÌÒÖ±²¥was awarded a contract for the construction and installation of a thermal vacuum chamber test facility for Ball Aerospace Technologies, Corp. The scope of work for the facility included the engineering, procurement, fabrication, and construction of a D-shaped thermal vacuum chamber. The chamber is being fabricated of stainless steel with carbon steel stiffeners. Ó£ÌÒÖ±²¥is installing the thermal control units, vacuum valves, vacuum pumps and associated systems. Additionally, the units are being installed with stainless steel vacuum jacketed piping.

Scope of Work

  • Engineering
  • Procurement of all equipment
  • Fabrication of chamber, piping, structural steel
  • Construction
  • Installation of copper pipe
  • Installation of stainless steel pipe
  • Installation of stainless vacuum jacketed pipe
  • Helium leak testing of chamber to 1x10-6 std cc/sec
  • Commissioning and aerospace testing
  • Under vacuum, the floor of the chamber has over 2MM pounds of force pressing on the chamber

Put Our Standard
To The Test.

Get in touch with Ó£ÌÒÖ±²¥ for your next project.
return to top icontop